this post was submitted on 01 Jun 2024
394 points (97.6% liked)
Technology
59219 readers
3145 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
A consortium of Utah's utilities (UAMPS) literally just pulled out of its commitment to backing NuScale's modular reactor in November 2023. It was a problem of cost, when the construction looked like it was going to become too expensive, at a time when new wind construction is dropping the price of wind power. It basically just couldn't compete on cost, in the specific environment of servicing Utah.
I wouldn't sleep on geothermal as a future broad scale solution for dispatchable (that is, generation that can be dialed up and down on demand) electrical power. The oil and gas fracking industry has greatly improved their technology at imaging geological formations and finding places where water can flow and be pumped, in just the past decade. I expect to see over the next decade geothermal reach viability beyond just the places where geothermal heat is close to the surface.
Yeah, I just saw that news, which apparently happened end of last year. The public wants nuclear (or at least a non-coal base power), but projects keep getting delayed or scrapped due to local lawsuits or local governments pulling financial support.
Geothermal is cool, and apparently there's an active project. It should produce 400MW, which is pretty significant, but still a pretty small fraction of total capacity (~9.5GW).
If the Blue Castle project ever finishes, it'll supply ~1.5GW power. That, with geothermal, could take up ~1/4 of the total energy generation, which would be a really good start. I'd also like to see hydrogen production as a "battery" source (produce from solar, burn at night). Looks like that's under development as well.
Lots of interesting things are happening now, I just wish they started 10+ years ago...
Scrapping the NuScale project had nothing to do with lawsuits. Governments pulled their financial support because projected costs were exceeding what was contractually promised, mostly due to pandemic-related supply chain and inflation issues.
This is typical of nuclear. The industry wants to believe its problem is regulation. It's not, at least not if you want to have better safety guarantees than the Soviet Union did. Its problem is that to be safe, nuclear is expensive, and there doesn't appear to be a way out of that.