this post was submitted on 13 Aug 2023
228 points (97.1% liked)

Technology

58157 readers
4161 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

A feud is heating up between Arizona workers and the world's leading chipmaker after the company claimed the US doesn't have the skills to build its new factory::TSMC wants to bring in foreign reinforcements to get its Arizona factory running because it claims there aren't enough qualified local workers.

you are viewing a single comment's thread
view the rest of the comments
[โ€“] stigmata@lemmy.world 1 points 1 year ago (1 children)

I don't understand your example. You don't just tell someone "Hey, I want an acoustic testing chamber."

Your "experts" are going to have the plans already made and the contractors build to that spec. The contractors don't 'decide where to use metal or foam. Your experts' building plans should have that already in there, otherwise they aren't much of an expert.

[โ€“] Puzzle_Sluts_4Ever@lemmy.world 2 points 1 year ago* (last edited 1 year ago)

Have you ever worked with contractors?

Nothing is ever done truly to spec. And you also learn fun lessons about the ramifications of not specifying exactly what size and head screws to use on that cabinet. Every other cabinet said to use zinc plated square maxi-loc head 1.5 inch screws, but this cabinet didn't specify so they actually used iron phillips head screws because they had extras. Or maybe that is actually a gang box and now you have the problem where there is not enough clearance to have a light switch on each side of a wall.

Now extrapolate that to something where minute differences can completely break processes months or years down the line.

The GN acoustic chamber is a good example of just what kind of thought goes into something like that. And that is caveman shit relative to a fab.


And just to be clear, this is not me shitting on contractors. A halfway decent contractor is way better at building stuff than I ever will be and it is important to actually specify anything you care about.

But also, as someone who needs to redo his floors because the folk the previous owners hired were grossly incompetent? Fuck them contractors.