this post was submitted on 10 Apr 2024
41 points (90.2% liked)

Canada

7203 readers
165 users here now

What's going on Canada?



Communities


🍁 Meta


πŸ—ΊοΈ Provinces / Territories


πŸ™οΈ Cities / Local Communities


πŸ’ SportsHockey

Football (NFL)

  • List of All Teams: unknown

Football (CFL)

  • List of All Teams: unknown

Baseball

Basketball

Soccer


πŸ’» Universities


πŸ’΅ Finance / Shopping


πŸ—£οΈ Politics


🍁 Social and Culture


Rules

Reminder that the rules for lemmy.ca also apply here. See the sidebar on the homepage:

https://lemmy.ca


founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] olbaidiablo@lemmy.ca 18 points 7 months ago (10 children)

What we need is for CMHC to start building houses instead of leaving it to developers. Developers will only make the most profitable houses, which are the McMansions you see going up like crazy but no one can afford.

[–] northmaple1984@lemmy.ca 3 points 7 months ago* (last edited 7 months ago) (9 children)

The CMHC isn't a constructor, they have no way of building houses themselves. They need to pay people to build it through their funding, except them providing funding comes with issues too.

I am a designer on a low-income apartment building being constructed by a non-profit organization in Niagara Region and it is 100% government funded (through CMHC I believe). The government took nearly 9 months to approve the funding after all the bids by constructors were received around April 2022 and given the rate of inflation at the time (and construction inflation was higher than the general rate) no subtrades held their price. The government refused to increase the funding to cover the extra cost due to inflation and as a result this building is being value engineered to high heaven and will probably be pretty terrible build quality.

What you're asking for is effectively a blank cheque for subtrades (and to an extent, designers... even if CMHC uses generic plans everywhere they need local professionals to take responsibility for the permitting process of each individual build, which includes regular inspections and reports) because none of these people trust that the government is competent enough to actually do it properly so they price high to account for fuck ups. (Ex. If CMHC handed me plans to be used I definitely would not blindly sign things off for the local AHJ and put my professional license at risk)

[–] healthetank@lemmy.ca 1 points 7 months ago (1 children)

I work on the linear infrastructure side as a consultant - any particular reason that they took so long to award the tender? That seems extreme given that I regularly work with municipalities and tendering processes, and its a pretty well oiled machine - 1 month is about as long as I've ever seen the award be stretched, unless the engineering cost estimate was waaaay below the bids and they had to secure additional funding.

[–] northmaple1984@lemmy.ca 0 points 7 months ago* (last edited 7 months ago)

They needed the government funding approved in order to award the contract and the approval process (which required all bids to be submitted, not just the planned awarded one) unexpectedly took 9 months with the feds. It wasn't a municipal project either, it was a local nonprofit org.

I work a lot with the architect that is overseeing the project and not once did they complain about having to submit extra info to the fed (and I have a pretty solid relationship with them so while not completely professional to complain like that it's the type of thing that would have come up in side conversations in-person when meeting up for other projects)

load more comments (7 replies)
load more comments (7 replies)