this post was submitted on 20 Oct 2023
133 points (89.3% liked)

Technology

73067 readers
3047 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 2 years ago
MODERATORS
 

MIT engineers and collaborators developed a solar-powered device that avoids salt-clogging issues of other designs.

More details in their paper here

you are viewing a single comment's thread
view the rest of the comments
[–] lnxtx@feddit.nl 19 points 2 years ago (2 children)

The researchers estimate that if the system is scaled up to the size of a small suitcase, it could produce about 4 to 6 liters of drinking water per hour and last several years before requiring replacement parts. At this scale and performance, the system could produce drinking water at a rate and price that is cheaper than tap water.

But can it be scaled up even more? Like cubic meters per hour?

[–] sin_free_for_00_days@sopuli.xyz 15 points 2 years ago

I just keep waiting for them to actually produce the small suitcase sized product. It sounds like a excellent option for me, as opposed to the $4-5k desalinators that are the options now.

[–] merde@sh.itjust.works 2 points 2 years ago (2 children)

but why "if"?

if they're making this research, why wouldn't they "scale up to the size of a small suitcase" and get rid of the "if"?

[–] Genrawir@lemmy.world 14 points 2 years ago

That's just how research works most of the time. The experimental setup required to build a working prototype and prove the initial hypothesis is always going to be larger and more complex than a mass market appliance. If that appliance ever gets built depends on a huge number of factors too. If the process scales as expected, how complex the device is to produce and if a company thinks that it can make money on it. The researchers, meanwhile, are probably more worried about their next grant funding.

[–] Pons_Aelius@kbin.social 3 points 2 years ago

My guess: They don't have the money to do so.