this post was submitted on 04 Dec 2025
459 points (99.4% liked)

Technology

77096 readers
3757 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Buelldozer@lemmy.today 8 points 7 hours ago

Power availability is actually a primary consideration when choosing a location for a Data Center. Sometimes they'll site a DC even if there isn't enough power and then build out the power generation that they need.

An example are the two DCs that Microsoft is building in Cheyenne, Wyoming and the absolutely massive 1.2 Million panel solar farm being built to power them. https://cowboystatedaily.com/2024/05/11/massive-1-2-billion-1-2-million-panel-solar-farm-planned-for-south-cheyenne/

This is at least the second time that Microsoft has done this in Cheyenne. In 2016 they contracted for 237 MW of Wind Energy, which led to the Chokecherry and Sierra Madre wind farms being built / expanded. https://blogs.microsoft.com/on-the-issues/2016/11/14/latest-energy-deal-microsofts-cheyenne-datacenter-will-now-powered-entirely-wind-energy-keeping-us-course-build-greener-responsible-cloud/

No matter what you think of AI the folks that engineer these DCs aren't stupid. They are well aware of their extreme power requirements.