this post was submitted on 13 May 2026
552 points (99.3% liked)

Technology

84623 readers
5950 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 2 years ago
MODERATORS
 

The Stratos artificial intelligence datacenter footprint will cover more than 40,000 acres (62 sq miles) over three sites in Box Elder county in north-western Utah. The facility will require about 9GW of power, which is more than the entire state of Utah currently consumes, and suck up a significant amount of water in an area that has been hit by severe drought in recent years.

you are viewing a single comment's thread
view the rest of the comments
[–] IHeartBadCode@fedia.io 19 points 1 day ago (2 children)

It's located on the Ruby Pipeline which will serve as the primary source of energy in the short term. Additionally, the data center being classified as a national security site, is located near the Utah Test and Training Range.

Longer term the facility is looking at nuclear facilities for power and the possibility for a runway and aviation facilities.

The primary customer of this facility will be the United States military.

[–] GreenBeard@lemmy.ca 17 points 1 day ago

This. US military is the target market. That people live there, that humans need water to live, and that powering this is going to entirely erase the local agriculture and wider ecosystems are all irrelevant. Deus Vult.~

[–] redsand@infosec.pub 3 points 18 hours ago (1 children)

This is also why Utah. They will staff it with mormons and have fiber runs already

[–] Tollana1234567@lemmy.today 1 points 17 hours ago

they build it in red states because of the lack protest/resistance against it, at least from the gop.