this post was submitted on 21 Nov 2023
1 points (100.0% liked)
Homelab
371 readers
3 users here now
Rules
- Be Civil.
- Post about your homelab, discussion of your homelab, questions you may have, or general discussion about transition your skill from the homelab to the workplace.
- No memes or potato images.
- We love detailed homelab builds, especially network diagrams!
- Report any posts that you feel should be brought to our attention.
- Please no shitposting or blogspam.
- No Referral Linking.
- Keep piracy discussion off of this community
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
The setup is fine since you're obviously trying to be budget conscience. I'd say cable management is really what you need more than anything else.
However, if you're handy with wood and a saw, or sheet metal and a brake (I assume you don't have a 3d printer):
Once you have all your NUCs in modular stacks, you can just run network cables and C13 power cords neatly along the front of the shelf, and have them input at the bottom of each stack. Then just tie your runs to each stack in a neat bundle and mount your switches to the underside of those shelves.
If you need to service a stack, you can just disconnect the stack in question at the termination points at the bottom of the stack and lift the whole assembly out, without having to play with wires. If you want to be extra fancy, you can even set up grooves or guides on the shelf to ensure the stacks are always placed in the correct position.