DO IT
Canada
What's going on Canada?
Communities
🍁 Meta
🗺️ Provinces / Territories
- Alberta
- British Columbia
- Manitoba
- New Brunswick
- Newfoundland and Labrador
- Northwest Territories
- Nova Scotia
- Nunavut
- Ontario
- Prince Edward Island
- Quebec
- Saskatchewan
- Yukon
🏙️ Cities / Local Communities
- Calgary (AB)
- Edmonton (AB)
- Greater Sudbury (ON)
- Halifax (NS)
- Hamilton (ON)
- Kootenays (BC)
- London (ON)
- Mississauga (ON)
- Montreal (QC)
- Nanaimo (BC)
- Oceanside (BC)
- Ottawa (ON)
- Port Alberni (BC)
- Regina (SK)
- Saskatoon (SK)
- Thunder Bay (ON)
- Toronto (ON)
- Vancouver (BC)
- Vancouver Island (BC)
- Victoria (BC)
- Waterloo (ON)
- Winnipeg (MB)
🏒 Sports
Hockey
- List of All Teams: Post on /c/hockey
- General Community: /c/Hockey
- Calgary Flames
- Edmonton Oilers
- Montréal Canadiens
- Ottawa Senators
- Toronto Maple Leafs
- Vancouver Canucks
- Winnipeg Jets
Football (NFL)
- List of All Teams:
unknown
Football (CFL)
- List of All Teams:
unknown
Baseball
- List of All Teams:
unknown
- Toronto Blue Jays
Basketball
- List of All Teams:
unknown
- Toronto Raptors
Soccer
- List of All Teams:
unknown
- General Community: /c/CanadaSoccer
- Toronto FC
💻 Universities
💵 Finance / Shopping
- Personal Finance Canada
- BAPCSalesCanada
- Canadian Investor
- Buy Canadian
- Quebec Finance
- Churning Canada
🗣️ Politics
- Canada Politics
- General:
- By Province:
🍁 Social and Culture
Rules
Reminder that the rules for lemmy.ca also apply here. See the sidebar on the homepage:
Why was it closed in the first place?
In 2012, the provincial government under then-premier Pauline Marois accepted Hydro-Québec’s recommendation to close Gentilly-2, in part because of the high cost of refurbishing the plant.
“More than 10 years later, costs can only go up because we’ve started dismantling the plant,” Pineau explained in an interview. An increase in construction costs in the last decade means “the nuclear bill could turn out to be very high,” he said.
Gentilly is near identical to the 660MW unit at Point Lepreau in NB. It needed a refurbishment after 28 years of operation. The estimate for the project was $1.5B and 18 months. It ended up taking $2.5B ($3.1B in today's money) and close to 4 years to complete (2008-2012). Just for reference, original construction costs were $3.8B in today's money.
With a ~70% lifetime capacity factor, it's been more of a liability for NBPower than anything.
When Gentilly was due for refurbishment, Hydro Quebec decided to decommission rather than going through the expense of refurbishment. Costs to put it back into service at this point are going to be very high. They already have solid baseload, so they'd be better off looking at more wind/solar.
Imagine how much wind and solar and new Hydro you could install across the province for the 3-4 billion in refurb costs?
There's so much that could be done with that money...
- Tuition reimbursement for students in trades that benefit the green power industry.
- Research and development for power storage - 'second life batteries', etc.
- Rebates and incentives to have homes install solar / wind / battery.
- Modernization / optimization projects like switching to heat pumps, variable speed pumps, etc.
- Efficiency projects like offsetting the costs of improving insulation in existing homes - with new windows/doors/etc.