this post was submitted on 17 Jul 2026
47 points (96.1% liked)

Technology

43299 readers
243 users here now

A nice place to discuss rumors, happenings, innovations, and challenges in the technology sphere. We also welcome discussions on the intersections of technology and society. If it’s technological news or discussion of technology, it probably belongs here.

Remember the overriding ethos on Beehaw: Be(e) Nice. Each user you encounter here is a person, and should be treated with kindness (even if they’re wrong, or use a Linux distro you don’t like). Personal attacks will not be tolerated.

Subcommunities on Beehaw:


This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.

founded 4 years ago
MODERATORS
all 9 comments
sorted by: hot top controversial new old
[–] verstra@programming.dev 17 points 1 week ago (2 children)

dousing them with a mixture of hydrogen peroxide, acetic acid, salt, and acrylic paint

Is there a civil engineer here who would know what degree of damage will this cause?

[–] impairedimperator@lemmy.zip 14 points 1 week ago (2 children)

Pretty minor. If they picked up the whole data center and soaked it in a large jug of 10% acetic acid for about nine months, the concrete would lose about 20% of its strength.

Not sure about the civil engineering side, but I assume there's enough safety factor in your average construction to account for 20% strength loss.

[–] village604@adultswim.fan 3 points 1 week ago (1 children)

That safety margin is supposed to last many years, though. If it's removed before the building is even constructed, it might have to be re-poured.

[–] impairedimperator@lemmy.zip 9 points 1 week ago (1 children)

Yeah, but we're talking about literally soaking the entire building in concentrated vinegar for months, not throwing a water balloon of regular vinegar at it. This particular case probably didn't do anything

[–] village604@adultswim.fan 2 points 1 week ago

Fair enough

[–] BlameThePeacock@lemmy.ca 11 points 1 week ago

Not an engineer but vinegar (ascetic acid) at full strength applied early enough during curing could be a problem. If it's the watered down stuff for home use and the concrete was already partially cured it wouldn't do almost anything.

[–] jtrek@startrek.website 11 points 1 week ago

Cool. Fuck Microsoft

[–] Earthling105b@midwest.social 2 points 1 week ago

Would it have made more sense for them to claim it was a secret mixture of stuff that destroys concrete? If the engineers were obligated to check the structure because they didn’t know what was sprayed on it, that would have delayed construction, even if the liquid was pretty benign.